Packing the engine from MMA 263 after being rebuilt         
With the help of the 15 ton overhead crane in the Machine shop at Derby and 3 workers in the container begin loading parts and the engine from 263 for Poland
Date: 5/14/2006 Location: Derby, ME   Map Show Derby on a rail map Views: 414 Collection Of:   Rod Bushway
Author:  Rod Bushway
Packing the engine from MMA 263 after being rebuilt
Picture Categories: This picture is part of album:  MMA Derby Shops
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=385465